6 STEPS IN WHICH LAYOUT MARKING IS DONE

A layout indicates where a structure needs to be placed on your plot. The process of constructing a home begins with layout marking. If not paid attention to, then your home might differ from the plan.

1

 

Lets have a look at how layout marking is done.

 

1
 

First, set the placement of the pillars on the vacant plot with the help of the engineer and architect. Then, with the help of 2-3ft steel rods and a rope, set the baseline and other boundaries

2

 

 

2
 

Confirm with experts that the size and positioning of the walls are sufficient to bear the load of the building.

3

 

 

3
 

After fixing the location of pillar placement, mark the excavation area with chalk powder.

4

 

 

4
 

Ensure soil testing is done before beginning the excavation work.

5

 

 

5
 

The depth of the pillars will depend on the condition of the soil. If the soil is loose, the pillars should be placed deeper.

6

 

 

6
 

Always ensure that the marking work is done according to your homes plan

These were some tips on layout marking.

For more expert home building solutions and tips, keep following #BaatGharKi by UltraTech Cement

Get In Touch

Get Answer To Your Queries

Enter a valid name
Enter a valid number
Enter a valid pincode
Select a valid category
Enter a valid sub category

By submitting this form you are authorizing UltraTech Cement to contact you.

Please check this box to proceed further