UltraTech Rapid: Fast Setting High Strength Concrete

Fast setting high strength concrete

In a city always on the move, nobody can afford to be slow & steady on repairs.

Repair done with regular concrete requires minimum 2 weeks to gain workable strength, which we are rarely provided with, given the urgency. This adversely impacts the quality of our work leading to more and frequent repairs.

Despite our best effort & intention, the disruption & inconvenience causes irreparable damage to our reputation.

Introducing UltraTech Rapid

An amazing concrete that gains high early strength without affecting normal placement procedures.

Infused with special ad mixtures, UltraTech Rapid can be customized to deliver workable strength in as less as 6 hours. It enables you to complete difficult repair jobs overnight with great confidence and excellence.

Delivering durable repair overnight is now possible with UltraTech Rapid.

Why settle for the ordinary, when you can build the extraordinary!

Lesser stripping time for repair works

Lesser stripping time for repair works

Lesser de-shuttering time for RCC structures thus doubling the number of rotations of formwork

Lesser de-shuttering time for RCC structures thus doubling the number of rotations of formwork

Benefits

Lesser stripping time for repair works

Lesser stripping time for repair works

Lesser de-shuttering time for RCC structures thus doubling the number of rotations of formwork

Lesser de-shuttering time for RCC structures thus doubling the number of rotations of formwork

Technical Features

Strength class: 30 Mpa in12 hrs or 24 hrs or 48 hrs basis customization
Reduction in plastic cracking
Excellent flowability

Recommended Applications

Placeholder edit in CMS Quotes

"For our new housing project, we were running in a delay. But as per our commitment to customers and RERA guidelines we had to complete the job in record time. This seemed impossible since a lot of concrete work was left. This is when UltraTech team guided us to use Rapid and reduce the form work cycle time drastically. By saving time in form work we completed the project handover in time and avoided customer dissatisfaction"

Project head, reputed builder

Placeholder edit in CMS Quotes

"The municipal corporation wanted me to complete a bridge repair work in a major road. This had to be open for public use in less than 5 days! We thought this would be impossible but decided to consult UltraTech. They suggested we go for UltraTech Rapid, that could give us workable strength in less than 4 days. We wouldn't have to wait for 2 weeks. With assurance of UltraTech, we took the contract and made this challenging task possible"

Reputed road repair contractor of Mumbai

More surprising solutions:

Get In Touch

Get Answer To Your Queries

Enter a valid name
Enter a valid number
Enter a valid pincode
Select a valid category
Enter a valid sub category

By submitting this form you are authorizing UltraTech Cement to contact you.

Please check this box to proceed further