Projects
PimpalGaon-Nashik-Gonde Road

PimpalGaon-Nashik-Gonde Road Project

The Pimpalgaon-Nasik-Gonde road project will serve Nashik with a 6 kms long elevated corridor, seven flyovers, two major bridges, six vehicular under passes, six pedestrian under passes and a subway. The project will form a part of the Mumbai-Agra National Highway-3 route. The project is being powered by UltraTech Concrete. The seven flyovers will ensure smooth flow of traffic towards Mumbai as well as Agra. The flyover at Pathardi will be India’s longest integrated flyover.

The elevated corridor starting from Indranagar jogging track will run for 6 kms till K. K. Wagh Institute of Technology. This will have an up and down ramp at Dwaraka and Aurangabad Naka Junction. Once the construction of the elevated corridor is complete, Nashik will get India’s first externally strutted segmental box girder. The many firsts in this project will further cement UltraTech’s reputation as ‘the engineer’s choice’ for India’s best infrastructural projects.

0.13 million
CuM

OF ULTRATECH CONCRETE USED

Other projects

  • Bangalore Metro Rail
    Bangalore Metro Rail
  • Kolkata Metro Rail
    Kolkata Metro Rail
  • Coastal Gujarat Power
    Coastal Gujarat Power
  • Elevated express highway
    Elevated express highway
  • Bandra-Worli Sea Link
    Bandra-Worli Sea Link
  • Vallarpadam Rail Bridge Project
    Vallarpadam Rail Bridge Project